PlantConfiguration: ClosedCombinedCyclePlant(3 modules of 2 GT + 2 HRSG + 1 ST and 1 module of 3 GT + 2 HRSG + 1 ST )
Narrativedescription of theproject:
Existing Termoeléctrica de Warnes Plant provides power and electrical energy to the National Interconnected System (SIN) through five SGT-800 turbines, SIEMES brand, (40 MW each), a 230 KV elevator substation and an estimated gas consumption of 40 MMpcd. Project consists in a cycle closing of this two modules of 2,5GT/module with 2HRSG+1ST per module and adding 2 modules of one 2GT+1ST+2HRSG, obtaining a Power Output of 373 Mwe. Dry cooler technology used.