Location: East Rockingham, Wester Australia, AUSTRALIA
Client: Acciona Industrial
Final Client: AustralianRenewable Energy Agency
Development: 2020-2021
Processing capacity: 300.000 tons/year
Power Output: 28,9 MW
Boiler Technology: HITACHI INNOVA
Narrativedescriptionoftheproject:
The country’s second large-scale WTE plant, once completed, it will treat around 300,000 tons of waste every year, preventing more than 300,000 tons of CO2 equivalent per annum – the pollution generated by around 64,000 cars. The plant will have a net capacity to generate 29 MW of renewable electricity, equivalent to the consumption of more than 36,000 households, and will be located in the industrial region of Rockingham, 40 km south of Perth
The plant will treat residual waste from municipal, commercial and industrial sources. It will also recover around 73,800 tons of bottom ash every year, which will be processed and used in road bases and other construction materials.
GHENOVA scopeofworks:
Complete basic & detailedengineering, all disciplines.
Complete Basic Engineering and Detail Engineering, of all disciplines: Process Engineering, Mechanical & Piping, Civil, Structures & Architecture, Electrical and Instrumentation & Control.
Engineering services related to supply engineering, test and commissioning engineering.