Wind energy has become in one of the principal method of energy generation for the energy development worldwide, looking for encourage the use of environmentally friendly technologies.
The use of energy produced by air currents is converted by generators into electrical energy and in this way the park will generate 34 MW of power to be use.
GHENOVA scopeofworks:
Preliminarystudyforfeasibility.
Preliminary study for feasibility.
Technical evaluation of wind resources.
Initial micrositting and social and environmental technological evaluation of the El Dorado wind farm, Bolivia